Work has begun to repair Hajlan Bridge in Haditha district after flash floods damaged the structure in 2025, Al-Anbar Civilization Museum director Ammar Ali told Shafaq News on 23 October. Damage around the bridge’s supports prompted urgent repairs ahead of the rainy season.
Ali said further technical assessments were needed to determine the damage and suitable restoration methods. Historian Manaf Al-Alousi called for structural inspections, compatible repair materials and measures to reduce future flood damage.
The Ottoman-era stone-and-plaster bridge crosses Wadi Hajlan. The report gives no contractor, project cost or completion date.