DNO plans to expand drilling in the Kurdistan Region in 2027, according to its third-quarter results released on 29 October. A second third-party rig joined the eight-well programme that began shortly before the end of 2025.
The operator is considering a third large rig and drilling beyond the licence’s existing production footprint. It reported gross operated Tawke production of 73,200 barrels of oil equivalent per day in the third quarter; DNO holds a 75% interest in the licence. The additional rig has not been announced as contracted.